Townify
construction
In 2003, eight large projects were carried out in
succession at downtown area after bargain with 39 developers
early or later. 25 pieces of downtown tracts were auctioned
in this year for ¥90,343,000 in total, attracted investment
for ¥83,200,000. 0.8KM2 of the old downtown area was
rebuilt and 104,000M2 marketable houses were on tap.
A lot of new projects were carried out successfully,
they have brought up the grade of the city and will
be the new spot of downtown area. The projects include
Liaodu International Hotel, New Donghuan shopping street,
Yucai road shopping street, Shuanghu west road shopping
street, the West Lake piazza market, garden in the people's
square and the West Lake mountain village residential
distrist.
|
|
Layout
of towns
Chengguan
and Yaoli are the center towns, their function are the
center of politics, economy and culture of the county.
Chengguan is the political and cultural center, and
Yaoli is the industrial, trade and traffic center; Xindian,
Madian, Gaotang, Chengguan are the main center towns
of each section, Madian and Gaotang are the base of
industry development and the door of economic communication,
Xindian and Xihu emphasize the development of tour-economy
and aquatic product, Changji and Wulong give priority
to the agriculture comprehensive development.
|
 |
 |
The
basic establishment construction
In 2003,
capital asserts investment reached ¥1,144,240,000, increased
by 16.3% than the last year, include infrastructure
investment ¥581,460,000, increased by 50.4% than the
last year, renovate investment ¥133,060,000, increased
by 13.0% than the last year, real estate investment
¥74,450,000, increased by 89.1% than the last year.
|
| Constructing
of the keystone projects
In 2003, the alteration project of the water supply
system in town area evolved favorably, more than 20,000M
pipe were extended. The rebuild project of Wulong sect
of Shaogang-Sanyuan road and the earth work of Yaoli
railway station were completed, 50KM gravel road for
helping the poor completed on schedule, have calzada
of 437KM and 14 bridges repaired. The project of country
power supply system cost ¥130,000,000 was completed,
35KV power supply system for Wuji mine area and Linghuaigang
flood control system was completed, Baimiao 110KV power
supply system was authorized and began to be built.
The irrigate system with an investion of ¥62,300,000
of five years' duration was completed. The rebuilding
project of national highway 105# in Huoqiu and Nanjing-Xi'an
railway in Lu'an were open to traffic, the work of moving
the families on the building site of Fuyang-Lu'an freeway
in Huoqiu was completed.
|

|
 |
Environmental
protection
Environmental
protection work is further improved. The atmosphere
quality over the whole county reached the second degree,
the water quality of the two lakes, the three rivers
and the five reservoirs reached the third level, the
goal of "control one and reach two" is achieved.
|
|